Development Manual

The Whitsunday Regional Council Planning Scheme Development Manual (the Manual) took effect on 30 June 2017. The Manual applies throughout the Whitsunday Region.

The Manual was prepared to:
  • Provide a comprehensive, practical and authoritative guide through the development process from inception to completion for Developers, Consultants, Contractors and Council Officers;
  • Set out requirements for the preparation and submission of approval applications, design details and construction procedures that represent ‘best practice’ in accordance with state and national standards for design and construction; and
  • Detail the minimum acceptable engineering standards for infrastructure that will be owned and operated by Council
Standard Drawings

Water
 (PDF 2 MB)
Drainage (PDF 2 MB)
Roads (PDF 2 MB)
Stormwater Quality (PDF 500 KB)
Sewerage (PDF 3 MB)
  1. P  1300 WRC QLD (1300 972 753)
    Email  info@whitsundayrc.qld.gov.au

    CUSTOMER SERVICE CENTRES
    67 Herbert Street, Bowen
    Cnr. Stanley and Conway Streets, Collinsville
    52 Main Street, Proserpine
  1. LINKS

    My Dashboard   |   Privacy   |   Disclaimer   |   Accessibility   |   Site Map


    Powered by CivicPlus from ICON Software
  1. FOLLOW US
    Facebookin

    © Copyright Whitsunday Council 2014